HMRC Regional Hub – Birmingham

The new HMRC regional hub at the Arena Central complex in Birmingham has provided over 240,000 sqft of grade A commercial space over its ground and 13 upper floors.

The building features an external envelope of geometric glass and aluminium facades that create an iconic feature to this area of central Birmingham.

Technical

hmrc-regional-hub-6

Working closely with the façade contractor NACWL, specialist architectural metal fabricator Metalline have manufactured and supplied over 9000 m2 of aluminium UNITY Rainscreen Panels from their recently extended facility in Cannock. Delivery which commenced in September was completed within 10 weeks. The specification also included over 5000 m2 of ULTIMA Insulated Spandrel panels along with soffits, column casings and transition panels.

The detailed design of the building’s façade demanded a uniformity of colours which was achieved using a single ingot of J57S Up aluminium. The ULTIMA Insulated Spandrel Panels were finished in a black polyester powder coating. The individual UNITY rainscreen panels were supplied in a two – tone specialist 1934 and 1953 Unatex silver anodised finish.

Downloads

Image-102.png

ULT 5 Technical Information

Image-113.png

Building Regulations Guidance

Image-102.png

ULT 3 Technical Information

Image-102.png

ULT 2 Technical Information

Image-97.png

ULTIMA A1 Brochure

View Case
Study

Gallery

Other Projects

Contact Us